Today was a big day because we had workers here at 7AM. A huge pumper truck arrived and got set up and by 9AM the first of four concrete trucks arrived. By noon, all was poured and the finishing touches were being done. Slab and footings are curing. In a week or so, the contractor will be back to do a retaining wall around the area that is below grade.